Ichthys Gas Field Project - iMINCO Mining Training Information

Ichthys Gas Field Project

Ichthys Gas Field Project

Ichthys GasFollowing substantial technical studies and with the support and encouragement of the Northern Territory Government, INPEX has announced that Blaydin Point in Middle Arm Peninsula in Darwin has been selected by the Ichthys Joint Venture as the location for a proposed LNG processing facility for gas from the Ichthys Gas Field.

INPEX estimates that more than US$20 billion in capital expenditure will be required to construct the onshore and offshore facilities needed for the project.

The first LNG shipment from Darwin is planned for late 2014 or early 2015. A final investment decision on the project is expected to be made early in 2010.

Location

The Ichthys Gas Field lies about 850 kilometres west-south-west of Darwin in the Timor Sea and is one of Australia`s largest undeveloped gas fields..

Benefits

  • 2000 employees required in Darwin during the peak of the four-year construction phase of the project from 2010
  • US$20 billion in capital expenditure
  • 300 full-time jobs in Darwin to maintain and operate the onshore facility
  • Resource expected to last 40 years

Stay in touch withAustralian Mining Projects andbe alerted for:MINING Project News

  • Job Vacancies
  • UpcomingStages
  • Project Outlook

Register for MININGProject News

* Email
First Name

Learn more about the Bowen Basin mining location.

The Bowen Basin contains the largest coal reserves in Australia. This major coal producing region contains one of the world’s largest deposits of bituminous coal.

The Basin contains much of the known Permian coal resources in Queensland including virtually all of the known mineable prime coking coal. It was named for the Bowen River, itself named after Queensland’s first Governor, Sir George Bowen.

The Bowen Basin covers an area of over 60,000 square kilometres in Central Queensland running from Collinsville to Theodore and is dotted with many coal mines operated by multiple mining companies.

Caterpillar Haul truck 793

Caterpillar Haul truck 793

The 793F has a load cpacityof 226.8 ton (US) and a top speed of 60 kilometres an hour. It's a turbocharged air-to-air aftercooled diesel engine that has enhanced power management capability for maximum hauling performance. The C175-16 is a 16-cylinder, four-stroke design that uses long, effective power strokes for optimum efficiency.

The 793F, is an autonomous-driven truck. Over 100 793F trucks are now operating via Command for hauling, the Cat autonomous truck operations system, which is a part of Cat MineStar™

Read more about the CAT 793 automomous mining dump truck on our website.

Resources and Infrastructure Industry (RII)

Commonly refered to as Black Coal Competency (BCC), the RII competency is one that can be attained by an operator who has previously worked in the industry and has completed a number of operating hours on various types of machinery.

RII competency is granted to prove correct and safe operation of mine site machinery. It is a very useful qualification to have, as it confirms the operator has the required experience and expertise.

Find out more about RII Competencies here

You can transfer your nationally recognised civil Excavator, Front End Loader or Dozer tickets only to RII Black Coal Competencies.

Email this job to yourself for future reference

Add your email address and name to get the details

Email:
Name: